Previous Work

Below is a sample of some of our previous work, click the link to be taken to the job page and find out more about that particular job.

  • February 15, 2019
    Cobham
  • February 15, 2019
    Becket Keys School, Brentwood
  • February 15, 2019
    Eurolink Way, Sittingbourne
    Two steel frame commercial warehouses at Eurolink Way, Sittingbourne. We completed all sub-structure, ground floor slabs, drainage, an attenuation...
  • February 15, 2019
    Seybourne Park, Braintree.
    A 6,790 sqm site, being used as a large manufacturing premises. We were tasked with carrying out a large...
  • June 29, 2016
    B&S Healthcare, Ruislip, Middlesex
    3 storey steel frame construction of approximately 7000 sq.m. floor area, works consisting of site preparation, pile cap and...
  • March 9, 2016
    Great Notley Country Park
    Great Notley Country Park – Design and Build SBR Unit, control kiosk, floor and foundation slabs, retaining wall, new...
  • March 9, 2016
    Costa Coffee and Subway
    Costa Coffee and Subway, Turner Rise Retail Park, Colchester – 2No. pod units. Works comprising of piling /...
  • May 19, 2016
    Braiswick School
    Braiswick School – a £7 million project with capacity for 420 pupils built on a green field site. Our works...
  • March 10, 2016
    Bentley Place
    Bentley Place is an exclusive new collection of elegant 3, 4 and 5 bedroom family homes in picturesque Bentley...
  • March 9, 2016
    Sittingbourne
    A 5500m² office and warehouse new build recently completed in Sittingbourne, Kent.
  • March 9, 2016
    Pineapple Warehouse
    An office and warehouse recently built in New Hythe, Kent. The Office being 20,000sq.ft and the Warehouse being...
  • March 9, 2016
    Theobald Street
    4No. detached high specification residential dwellings.
  • March 9, 2016
    SEC
    New College for South Essex Colleges. Works comprised of enabling works remediation package, services, drainage and externals...
  • March 9, 2016
    Pura Foods
    New reinforced concrete weighbridge within the Pura Foods Oil Refinery.
  • March 22, 2016
    Benfleet
    A one off substantial sized dwelling, designed by an Architect Client to an extremely high standard. Works comprised gabion...
  • March 9, 2016
    Forge Farm
    30,000sqft. Program: 40 weeks. Secured planning for this client’s scheme in Staplecross, Kent. The contract to build was negotiated...